All posts tagged: solar system Price in Noida

IB Solar introduces state of the art microprocessor based DC-AC converter

No comments

IB Solar introduces state of the art microprocessor based DC-AC converter that requires no battery and no mains power for functioning. It converts direct solar panel energy to power for running electrical appliances such as fans, lights, water pumps, washing machines and many more.

Visit us at www.ibsolar.co.in

adminIB Solar introduces state of the art microprocessor based DC-AC converter
read more

SOLAR HOME LIGHT

No comments

These solar driven LED street lights produce powerful illumination and come with easy installation with no hassles of digging, laying down cable wires, establishing transformer distribution points etc. They are ideal for illumination in the main roads/areas of campuses, lighting up streets, gardens etc.

BENEFITS:
  • Significant cost savings in avoiding to lay down electrical wires, distribution points, employing labor and doing away with digging hassles.
  • High durability of solar panels and LEDs. Both solar panels and LEDs last for more than 10 years. In comparison, the conventional sodium and CFL lamps typically require replacement at least once every year .
  • Close to a month’s time saved in newly constructed places as a result of easy installation (feedback from builders).
  • Zero electricity cost.
  • 80% depreciation benefits.
  • Environment friendly and easy disposal due to absence of harmful substances like mercury and lead.
  • Less heat dissipation
  • Higher color temperature of light (purer form of light)
  • Carbon Credits and subsidies may be availed for large installations.

 

adminSOLAR HOME LIGHT
read more

600 MW K’taka solar projects stuck over new wheeling, transmission charges

No comments

A total of 600 MW solar power projects, set up with the investment of Rs 2,500 crore under the open access scheme, in Karnataka.

A total of 600 MW solar power projects, set up with the investment of Rs 2,500 crore under the open access scheme, in Karnataka have come under severe stress after the state electricity regulator last month increased wheeling and transmission charges retrospectively.

admin600 MW K’taka solar projects stuck over new wheeling, transmission charges
read more